Industry & supply chain
Juste-à-temps (JAT / JIT)
FRMode d'approvisionnement et de production où les pièces sont fabriquées et livrées au moment précis où elles sont requises en aval. Il réduit les stocks immobilisés mais exige une fiabilité de livraison élevée de la part du fournisseur.
ENA supply and production model in which parts are made and delivered exactly when they are needed downstream. It reduces tied-up inventory but demands high delivery reliability from the supplier.
See also
More terms — Industry & supply chain
- AlambicDistillation apparatus made up of a heated pot, a swan neck and a condenser. Copper pot stills and column stills each shape the aromatic profile of the distillate.
- Assemblage mécaniqueStage where fabricated parts are built into sub-assemblies or finished products: fastening, riveting, insert installation, component integration and functional checks. Outsourcing assembly reduces on-site installation labor.
- Brassage (mashing)Preparation step in which milled grain is mixed with hot water to convert starch into fermentable sugars.
- CNCMachining technology where the machine (mill, lathe) is driven by a computer program. Simultaneous 5-axis is the standard for complex aerospace and medical parts.
- Colonne de rectificationTray or packed column that multiplies evaporation-condensation cycles to obtain a high-purity alcohol, typically for vodka.
- Conception pour la fabrication (DFM)Engineering review of drawings before production to adjust materials, tolerances, bend radii and finishes in order to cut cost and scrap. Early DFM shortens lead times and limits back-and-forth during production.